Peak shaving at Telecom operator

Due to capacity growth in a data center in the Alkmaar region, where capacity expansion was not possible due to a limitation of the contracted transmission capacity, we installed a Peak shaving installation. Assuming an expansion of 20kW load in the data center, a solution was chosen with 40 470Wp PV panels on the roof in combination with classical lead-acid batteries of 66.3kWh. By means of this installation, the peak currents caused by the cooling units are equalized, leaving power available on the grid connection for the IT equipment.

Photos of this project

Pagina delen

Commissioning date
15-05-2024


Owner of the project
Eurotronic


Province
North Holland


Power in kW
60kW


Capacity in kWh
66kWh